Transportation / Vernon, CT

Pleasantview Drive Bridge Replacement

Client: Town of Vernon
Provided Services:
Pleasantview Masthead Desktop

Accelerated construction schedule

Our role

Milone & MacBroom provided construction engineering and inspection services for the replacement of Bridge No. 04576, Pleasantview Drive Bridge over the Hockanum River in Vernon, CT. The project was funded under the Federal Local Bridge Program using the Pilot Program for 100% Design Funding.

The project consisted of the removal of the four existing culverts carrying the Hockanum River under Pleasantview Drive and replacement with a precast substructure and precast deck units.

The work included:

Temporary water handling measures
Excavation of the roadway & embankments
Removal & replacement of a sanitary sewer line under the stream downstream from the structure
Installation of drilled shaft and pilings
Installation of precast footings, abutments & wingwalls to complete the substructure
Installation of precast deck units & approach slabs
Concrete placement of sidewalks & parapets
Bridge rail installation

The roadway was closed during construction with an extensive detour. Roadway work included roadway base installation, paving, railing installation, embankment formation, and site restoration. Environmental work consisted of special handling of the removal of the existing bridge rail and fencing and confined space work to complete the new sanitary sewer installation.