Transportation / Farmington, CT

Route 4 Improvements

Client: State of Connecticut Department of Transportation
Provided Services:
Route4 Farmington Mobile

Safety & traffic operational improvements

Our role

Milone & MacBroom provided construction engineering and inspection services on a project providing Safety & Traffic Operational Improvements on Route 4 (Farmington Avenue) from Garden Street to Mountain Spring Road. The project was funded through the Connecticut Department of Transportation.

The project consisted of approximately 2,500' of roadway improvements through the Historic District of Farmington and the construction of a new road to improve business access and traffic congestion. The entire site required the handling and disposal of controlled materials. The construction was performed in five stages with long-term maintenance and protection of traffic controls. Improvements included:

Roadway reconstruction & widening
Imprinted sidewalks
Public outreach
Drainage improvements
Landscaping & site lighting
Decorative crosswalks
Traffic signal modifications
Culvert replacement
Stakeholder coordination